DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:05.08 10:07

  • NIGERIA | LAGOS:05.08 11:07

  • EGYPT | CAIRO:05.08 12:07

  • UAE | DUBAI:05.08 14:07

  • SRI LANKA | COLOMBO:05.08 15:37

  • SINGAPORE:05.08 18:07

  • ENGLAND | LONDON:05.08 11:07

  • RUSSIA | MOSCOW:05.08 14:07

  • CHINA | BEIJING:05.08 18:07

  • AMERICA | Los Angels:05.08 03:07

  • AMERICA | New York:05.08 06:07

  • BRAZIL | San Paulo:05.08 07:07