DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:05.02 09:30

  • NIGERIA | LAGOS:05.02 10:30

  • EGYPT | CAIRO:05.02 11:30

  • UAE | DUBAI:05.02 13:30

  • SRI LANKA | COLOMBO:05.02 15:00

  • SINGAPORE:05.02 17:30

  • ENGLAND | LONDON:05.02 10:30

  • RUSSIA | MOSCOW:05.02 13:30

  • CHINA | BEIJING:05.02 17:30

  • AMERICA | Los Angels:05.02 02:30

  • AMERICA | New York:05.02 05:30

  • BRAZIL | San Paulo:05.02 06:30