DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:01.11 16:34

  • NIGERIA | LAGOS:01.11 17:34

  • EGYPT | CAIRO:01.11 18:34

  • UAE | DUBAI:01.11 20:34

  • SRI LANKA | COLOMBO:01.11 22:04

  • SINGAPORE:01.12 00:34

  • ENGLAND | LONDON:01.11 17:34

  • RUSSIA | MOSCOW:01.11 20:34

  • CHINA | BEIJING:01.12 00:34

  • AMERICA | Los Angels:01.11 09:34

  • AMERICA | New York:01.11 12:34

  • BRAZIL | San Paulo:01.11 13:34