DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:10.02 19:41

  • NIGERIA | LAGOS:10.02 20:41

  • EGYPT | CAIRO:10.02 21:41

  • UAE | DUBAI:10.02 23:41

  • SRI LANKA | COLOMBO:10.03 01:11

  • SINGAPORE:10.03 03:41

  • ENGLAND | LONDON:10.02 20:41

  • RUSSIA | MOSCOW:10.02 23:41

  • CHINA | BEIJING:10.03 03:41

  • AMERICA | Los Angels:10.02 12:41

  • AMERICA | New York:10.02 15:41

  • BRAZIL | San Paulo:10.02 16:41