DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:11.18 02:03

  • NIGERIA | LAGOS:11.18 03:03

  • EGYPT | CAIRO:11.18 04:03

  • UAE | DUBAI:11.18 06:03

  • SRI LANKA | COLOMBO:11.18 07:33

  • SINGAPORE:11.18 10:03

  • ENGLAND | LONDON:11.18 03:03

  • RUSSIA | MOSCOW:11.18 06:03

  • CHINA | BEIJING:11.18 10:03

  • AMERICA | Los Angels:11.17 19:03

  • AMERICA | New York:11.17 22:03

  • BRAZIL | San Paulo:11.17 23:03