Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:10.02 21:01
NIGERIA | LAGOS:10.02 22:01
EGYPT | CAIRO:10.02 23:01
UAE | DUBAI:10.03 01:01
SRI LANKA | COLOMBO:10.03 02:31
SINGAPORE:10.03 05:01
ENGLAND | LONDON:10.02 22:01
RUSSIA | MOSCOW:10.03 01:01
CHINA | BEIJING:10.03 05:01
AMERICA | Los Angels:10.02 14:01
AMERICA | New York:10.02 17:01
BRAZIL | San Paulo:10.02 18:01