Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:01.12 14:39
NIGERIA | LAGOS:01.12 15:39
EGYPT | CAIRO:01.12 16:39
UAE | DUBAI:01.12 18:39
SRI LANKA | COLOMBO:01.12 20:09
SINGAPORE:01.12 22:39
ENGLAND | LONDON:01.12 15:39
RUSSIA | MOSCOW:01.12 18:39
CHINA | BEIJING:01.12 22:39
AMERICA | Los Angels:01.12 07:39
AMERICA | New York:01.12 10:39
BRAZIL | San Paulo:01.12 11:39