Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:10.04 01:24
NIGERIA | LAGOS:10.04 02:24
EGYPT | CAIRO:10.04 03:24
UAE | DUBAI:10.04 05:24
SRI LANKA | COLOMBO:10.04 06:54
SINGAPORE:10.04 09:24
ENGLAND | LONDON:10.04 02:24
RUSSIA | MOSCOW:10.04 05:24
CHINA | BEIJING:10.04 09:24
AMERICA | Los Angels:10.03 18:24
AMERICA | New York:10.03 21:24
BRAZIL | San Paulo:10.03 22:24