Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:08.15 16:14
NIGERIA | LAGOS:08.15 17:14
EGYPT | CAIRO:08.15 18:14
UAE | DUBAI:08.15 20:14
SRI LANKA | COLOMBO:08.15 21:44
SINGAPORE:08.16 00:14
ENGLAND | LONDON:08.15 17:14
RUSSIA | MOSCOW:08.15 20:14
CHINA | BEIJING:08.16 00:14
AMERICA | Los Angels:08.15 09:14
AMERICA | New York:08.15 12:14
BRAZIL | San Paulo:08.15 13:14