The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:05.02 11:28
NIGERIA | LAGOS:05.02 12:28
EGYPT | CAIRO:05.02 13:28
UAE | DUBAI:05.02 15:28
SRI LANKA | COLOMBO:05.02 16:58
SINGAPORE:05.02 19:28
ENGLAND | LONDON:05.02 12:28
RUSSIA | MOSCOW:05.02 15:28
CHINA | BEIJING:05.02 19:28
AMERICA | Los Angels:05.02 04:28
AMERICA | New York:05.02 07:28
BRAZIL | San Paulo:05.02 08:28