DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-08-05

 

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:08.14 17:01

  • NIGERIA | LAGOS:08.14 18:01

  • EGYPT | CAIRO:08.14 19:01

  • UAE | DUBAI:08.14 21:01

  • SRI LANKA | COLOMBO:08.14 22:31

  • SINGAPORE:08.15 01:01

  • ENGLAND | LONDON:08.14 18:01

  • RUSSIA | MOSCOW:08.14 21:01

  • CHINA | BEIJING:08.15 01:01

  • AMERICA | Los Angels:08.14 10:01

  • AMERICA | New York:08.14 13:01

  • BRAZIL | San Paulo:08.14 14:01