The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:06.18 11:24
NIGERIA | LAGOS:06.18 12:24
EGYPT | CAIRO:06.18 13:24
UAE | DUBAI:06.18 15:24
SRI LANKA | COLOMBO:06.18 16:54
SINGAPORE:06.18 19:24
ENGLAND | LONDON:06.18 12:24
RUSSIA | MOSCOW:06.18 15:24
CHINA | BEIJING:06.18 19:24
AMERICA | Los Angels:06.18 04:24
AMERICA | New York:06.18 07:24
BRAZIL | San Paulo:06.18 08:24