DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-08-05

 

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:01.12 17:07

  • NIGERIA | LAGOS:01.12 18:07

  • EGYPT | CAIRO:01.12 19:07

  • UAE | DUBAI:01.12 21:07

  • SRI LANKA | COLOMBO:01.12 22:37

  • SINGAPORE:01.13 01:07

  • ENGLAND | LONDON:01.12 18:07

  • RUSSIA | MOSCOW:01.12 21:07

  • CHINA | BEIJING:01.13 01:07

  • AMERICA | Los Angels:01.12 10:07

  • AMERICA | New York:01.12 13:07

  • BRAZIL | San Paulo:01.12 14:07