The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:10.04 01:24
NIGERIA | LAGOS:10.04 02:24
EGYPT | CAIRO:10.04 03:24
UAE | DUBAI:10.04 05:24
SRI LANKA | COLOMBO:10.04 06:54
SINGAPORE:10.04 09:24
ENGLAND | LONDON:10.04 02:24
RUSSIA | MOSCOW:10.04 05:24
CHINA | BEIJING:10.04 09:24
AMERICA | Los Angels:10.03 18:24
AMERICA | New York:10.03 21:24
BRAZIL | San Paulo:10.03 22:24