The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:11.18 02:12
NIGERIA | LAGOS:11.18 03:12
EGYPT | CAIRO:11.18 04:12
UAE | DUBAI:11.18 06:12
SRI LANKA | COLOMBO:11.18 07:42
SINGAPORE:11.18 10:12
ENGLAND | LONDON:11.18 03:12
RUSSIA | MOSCOW:11.18 06:12
CHINA | BEIJING:11.18 10:12
AMERICA | Los Angels:11.17 19:12
AMERICA | New York:11.17 22:12
BRAZIL | San Paulo:11.17 23:12