The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:11.18 20:32
NIGERIA | LAGOS:11.18 21:32
EGYPT | CAIRO:11.18 22:32
UAE | DUBAI:11.19 00:32
SRI LANKA | COLOMBO:11.19 02:02
SINGAPORE:11.19 04:32
ENGLAND | LONDON:11.18 21:32
RUSSIA | MOSCOW:11.19 00:32
CHINA | BEIJING:11.19 04:32
AMERICA | Los Angels:11.18 13:32
AMERICA | New York:11.18 16:32
BRAZIL | San Paulo:11.18 17:32